USER GUIDE







            •  Following is the recommended coolant           •  Prior to using 8D or 12D drills, it is recommended to
              flow rate and pressure.                           drill a 1.5xD pre-hole using a short tool assembled
                                                                with same drilling head as for further operation
                         Coolant Flow Rate (liter/min)        •  Enter the pre-hole at slow speed and feed until 2-5 mm
                       30                                       from its bottom. Start the cooling system and increase
                                          flow
                                          rate                  rotation to the recommended drilling speed. Hold for 2-3
                       20                                       seconds, then continue at the recommended drilling feed.
                       10                                     1  Pre-hole for a 1.5xD depth for piloting.             EXCHANGEABLE DRILLING HEADS
                       5


                        6.8   12   16    20   25                              1.5xD
                             drill diameter D (mm)

                        Minimum Coolant Pressure (bar)

                     15
                     12  8 , 12 X D
                        5 X D                                 2  Enter the pre-hole at slow speed and
                     10  3 X D                                  feed until 2-5 mm from its bottom.
                        1.5 X D
                      8
                      5

                      3
                                                                               1.5xD
                       6     12     16    20    25
                             drill diameter D (mm)

            •  For optimal performance, it is recommended to adjust
              runout of outer points or chisel with a maximum of
              0.02 mm. Large runout will influence drill
              performance tool life and hole quality.
            •  No setup time is needed after indexing
              the SUMOCHAM drill head.                        3  Start the cooling system and increase
            •  SUMOCHAM drills can be used either on            rotation to the recommended drilling speed.
              milling centers or lathe machines.
            •  When using SUMOCHAM drill in stationary (lathe)
              applications, we recommend using the ISCAR GYRO
              device or eccenter sleeve to reduce misalignment.
              Misalignment will cause poor performance of the
              SUMOCHAM drill or even tool breakage.





                                                              4  Hold for 2-3 seconds, then continue at
                                                                the recommended drilling feed.